OficioHQ
Leer en espaƱol

How to write a plumbing quote

A good quote (or estimate) helps you win the job and protects you if questions come up later. Here is what it should include, a complete example, and how to set your price.

Make your quote for free

What a plumbing quote should include

  • Your details: business name, phone number, and your logo if you have one.
  • The customer's details: name, phone number, and the job address.
  • What you'll do, in plain words: "Replace 40-gallon water heater", not just "installation".
  • Materials and labor listed separately: the customer sees what they're paying for, and you see what your work earns.
  • The total, plus sales tax if your state charges it.
  • The deposit, if you ask for one: how much and what it's for.
  • How long the price is good for: material costs go up; 15 or 30 days is typical.
  • How the customer accepts: in writing, with a date. A "yes" over the phone does not protect you.

Example: replacing a water heater

Sample prices. Adjust them to your area and your costs.
ItemQtyPriceTotal
Gas water heater, 40 gallons1$650.00$650.00
Flex connectors, shutoff valve and installation materials1$85.00$85.00
Haul away and dispose of old water heater1$75.00$75.00
Labor: installation and testing4 hrs$95.00$380.00
Total$1,190.00

50% deposit: $595.00, to buy the water heater. Valid for 15 days.

How to price the job

Labor. Decide whether you charge by the hour or by the job. Hourly is fairer when you don't know what you'll find (a hidden leak, old pipe). A flat price is easier to sell when the job is always the same, like replacing a faucet or a water heater.

Materials. Charge what they cost you plus a markup for picking them up, hauling them, and standing behind them. Keep every receipt: it is a business expense and lowers your taxes.

The trip. If you drive far or lose half a day, add a trip charge or build it into the labor. That time is work too.

What you don't see. Tools, gas, insurance, your license, and what you set aside for taxes all come out of the same price. If your price only covers the hours on the job, you are losing money.

Mistakes that cost you money

  • Lumping everything into one number. If the customer haggles, you don't know what you're cutting: your profit or the cost of the water heater?
  • Leaving off an expiration date. Three months later they want the same price, and the materials already went up.
  • Starting without written acceptance. If there's a disagreement, you have no way to prove what was agreed.
  • Charging for extras by word of mouth. If the job grows, the extra goes on a separate quote the customer approves before you do it.
  • Losing track of payments. If the customer paid a deposit, by the end nobody remembers how much was paid or how much is left.

Do it in 30 seconds with OficioHQ

With OficioHQ you build this same quote on your phone and send it by text or WhatsApp from your own number.

  • Your customer opens it and accepts with one tap. It is recorded with the date and time.
  • Ask for a deposit as a percentage or a fixed amount, and say what it's for. Your customer sees it on the quote.
  • Choose how many days the price is good for: 7, 15, 30, or 60, counted from when you send it.
  • When the customer accepts, turn it into an invoice and record the deposit with one tap. You see what is left to pay.
  • If the job grows, add the extra as a change order, linked to the original quote.
  • Every payment and every materials receipt is saved for your tax report.

Free through April 30, 2027. Sign up with your email, no card needed.

Create my free account

Frequently asked questions

What's the difference between a quote and an invoice?

A quote is the price you propose before doing the work; the customer accepts it or not. An invoice is what you bill once the work is done.

Do I have to charge sales tax?

It depends on your state and the type of work. Some states tax materials but not labor; others tax everything. Ask your state tax office or your accountant. In OficioHQ you can turn tax on or off to match your situation.

How much of a deposit should I ask for?

Many plumbers ask for enough to cover materials, especially expensive ones like a water heater. On small jobs many ask for none. What matters is that it is written on the quote, along with what it covers.

How long should a quote be valid?

Between 15 and 30 days is typical. If material prices are moving a lot, use a shorter window: in OficioHQ you choose it on each quote.

Can I send the quote by WhatsApp?

Yes. With OficioHQ you send it by WhatsApp or text, and your customer opens it on their phone without installing anything.